I hope someone can help me. I’m trying to knit a pretty simple cable, but it’s not turning out like the picture and I’m not sure why.
I’m thinking it could be because of the yarn or gauge OR because for the wrong side rows it simply says “work sts as they lie” which to me means purl across, but I’m not sure because my sts are seated differently because I’m using the Combination (Eastern uncrossed) method.
Below is the chart and sample picture (the red one). Next to it is my swatch (in gray).
The symbol explanation says:
–_ cross 3 left: place 2 st in front with cable needle, k1, then knit sts on cable needle.
_/-- cross 3 right: place 1 st in back with cable needle, k2, then knit st on cable needle.
Hope to be back on track soon with your help! :knitting:
Thanks!!