I am knitting the Capbreton. The instructions for the button band is:
**BUTTONS BAND
With size 3 needles cast on loosely 9 (9 - 9) 9 (11 - 11) 11 (11 - 11) sts.
Row 1 (RS): k2, * p1, k1 *, repeat until 1 st from the end, sl1 purlwise wyif.
Row 2 (WS): work as established until 1 st from the end, sl1 purlwise wyif.
Repeat these 2 rows until 4 (4 - 4) 4.25 (4.25 - 4.5) 4.5 (4.5 - 4.5) inch or 10 (10 - 10) 10.5 (10.5 -
11) 11 (11.5 - 11.5) cm long.
Cut yarn and hold sts on cable, or yarn or small safety pin.
BUTTONHOLE
With size 3 needles cast on loosely 9 (9 - 9) 9 (11 - 11) 11 (11 - 11) sts.
Row 1 (RS): k2, * p1, k1 *, repeat until 1 st from the end, sl1 purlwise wyif.
Row 2 (WS): work as established until 1 st from the end, sl1 purlwise wyif.
Repeat these 2 rows until 4 (4 - 4) 4.25 (4.25 - 4.5) 4.5 (4.5 - 4.5) inch or 10 (10 - 10) 10.5 (10.5 -
11) 11 (11.5 - 11.5) cm long.
At the same time at 0.75 inch or 2 cm to cast-on row make the first buttonhole:
Buttonhole row (RS): k2, p1, k2 tog, yo, k1, p1, repeat 0 (0 - 0) 0 (1 - 1) 1 (1 - 1) more times, k1,
sl1 purlwise wyif.
Note: Make the following 3 buttonholes every 1.5 (1.5 - 1.5) 1.5 (1.5 - 1.75) 1.75 (1.75 - 1.75) inch
or 4 (4 - 4) 4 (4 - 4.5) 4.5 (4.5 - 4.5) cm.
The last two will be knitted on the neckline.
Cut yarn and hold sts on cable, or yarn or small safety pin.**
When I read the instructions (and started knitting), I interpreted that I was supposed to knit 1 buttonhole after 0.75 inches then three more every 1.5 inches. I thought the “last two button holes would be knitted on the neckline” in addition to the 4 on this band. However the entire buttonhold band is only supposed to be 4 inches. But 0.75 + 3(1.5) = 5.25 inches.
Am I supposed to only knit 3 button holes (0.75 + 1.5 + 1.5 = 3.75) and then stop when the band is 4 inches?
I’m not sure why my colours have turned out so pastel, hopefully you can see them well enough.
Also I can’t think in inches so i have marked up in cm but i think you will get the idea.
The blue line shows the beginning if the button band, the end of the button band (which is also the beginning of the neck band) and the top of the neck band.
The gaps between buttonholes are marked at 2cm 4cm and 4cm, this makes 10cm total band in this part and completes two buttonholes.
The next part is the neck band.
As soon as you begin the neck band you are ready to make a buttonhole because 4cm has already been worked since the last buttonhole, this is the thrid buttonhole.
4cm later make buttonhole 4.
4 buttonholes, spaced 4cm apart amd the last 2 are positioned in the neckband.
I’m not sure if you really need to cut the yarn at this point. If you are to pick up stitches for the neckband then perhaps keeping the yarn attached will work. Maybe read ahead before cutting.
That was extremely helpful! I’m unfortunately stuck once again..
So far I’ve knit the button hole band, the button band, the short rows for the back and the front right shoulder. These are the instructions for the front left shoulder. I really don’t understand the note about measuring yarn before picking up stitches. Am I supposed to try to use the 60 cm to pick up stitches and do the short rows? Why does the length matter? And when does the buttonhole band actually get connected to the sweater?
SHOULDER LEFT
Measure about 60 cm from the two threads and pick up the sts by starting at the neckline
keeping the threads connected to the skein on the right, then slip the sts over the cable so you
can knit a RS row.
Buttonhole band RS facing you, the cast-on row on the left and with 4 mm/US 6 circular needles
pick up 21 (21 - 21) 22 (22 - 23) 23 (24 - 24) sts along over all length.
Short rows shoulder
SR 1 (RS): k4, turn work.
SR 2 (WS): create DS, p to end.
SR 3 (RS): k until DS, k DS, k4, turn work.
SR 4 (WS): create DS, p to end.
Repeat last 2 rows 3 more times.
Work RS (includind DS) and WS rows.
Do not cut yarn.
BACK, FRONTS, and TOP of SLEEVES
Note: on next row, pick up sts between each front and back to form top of sleeves.
K 21 (21 - 21) 22 (22 - 23) 23 (24 - 24) sts of left front, PM, place the buttonhole band over the
buttonhole band and pick up and knit 6 (7 - 7) 7 (8 - 8) 9 (9 - 10) sts by inserting the needle
through the 2 bands. Then pick up and knit 6 (7 - 7) 7 (8 - 8) 9 (9 - 10) sts along top of shoulder
on back side (left sleeve), PM, resume and knit 72 (72 - 74) 80 (84 - 86) 88 (90 - 92) sts of back left
on hold, PM, pick up and knit 12 (14 - 14) 14 (16 - 16) 18 (18 - 20) sts along top of shoulder (right
sleeve), PM, resume and knit 21 (21 - 21) 22 (22 - 23) 23 (24 - 24) sts of right front left on hold.
You have 138 (142 - 144) 152 (160 - 164) 170 (174 - 180) sts in total.
Looking very nice and evenly worked.
The pattern designer is telling you what is going to happen and then giving you the directions for how to do it.
To make it easier to pick up the sts using your right hand, use the 60cm length of yarn to pick up. The remaining yarn of the 60cm will end up at the left of the buttonhole band at the cast on edge. The working yarn coming from the ball will be on the right of the buttonhole band.
Now begin the short row using the working yarn (strand coming from the ball of yarn not the 60cm) and knitting the first 4sts then follow the directions for the short rows.
Once the short rows are complete and you’ve worked RS and WS rows, you’ll knit across the buttonhole band, overlap the buttonhole band over the button band and then pick up sts through both bands to connect them. Continue down the left shoulder with more picked up sts then across the back sts on hold.
Glad to hear you managed the button band instructions.
Salmonmac has given a lovely diagram for the next part so I will just add your knitting looks very nice.
Let us know how you get on, it’s great hearing and seeing the progress.
I’m now lost on where the bands should overlap/where to knit through the two bands. Is is the pink, the purple, the blue? Or somewhere I didn’t even circle?
Overlap buttonhole band over entire button band. RS of front, back and button and buttonhole bans should be facing you.
Stitch through two bands to pick up sts, then pick up and knit down the back and finally knit across the held sts of the back.
I think you might have picked up on the wrong edge of the buttonhole band. I think the cast on edge should be at the left shoulder and the stitches on hold should be at the neck edge (same edge as the back button band stitches on hold) @salmonmac what do you think?
Yes, flipping the front piece will put the RS of the band facing. and will put the held sts at the neck edge. The cast on edges should be at the shoulder with the held sts at the neck. It looks like the pick up was on the wrong side of the buttonhole band (good pick up, Creations).