FO Irish Cardigan

I knitted this for my dad’s birthday/Father’s day and although we aren’t going to be able to drive down for vacation this summer, I will mail it out next week. Ingrid— :heart: I owe you SO big for helping me out with this. This was my third sweater, but first cardigan. Obviously it is big on me, but should fit him perfectly!

-Alison

:inlove: :inlove:

Stunning - you should be very proud!

:heart: :heart: :heart:

Wow :shock: :shock:
What a beautiful job. Absolutely beautiful! Your dad will love it! :cheering:

Julie

What a great sweater! I’m sure he’ll love it!

:cheering: :cheering:

Incredible gorgeous work!

Your dad’s going to be floored!

It turned out fantabulous!!! :cheering: :cheering:

:inlove: That’s just beautiful!

Great job!!! :thumbsup:

That is beautiful!

That is just gorgeous!

Wow! That’s amazing! And only your third sweater? Wow again!

Your sweater looks great! Did it take you a long time?

:cheering: :cheering: :cheering:

That looks absolutely wonderful! I’m sure he will love it. Good for you!

:cheering: :cheering: :cheering:

gorgeous!!!

Great job! He will love it!!

:cheering: :cheering: :cheering: Great job!

:cheering: :cheering: GORGEOUS!!! You did a fantastic job :thumbsup:

Awww, thanks gals! :blush:

DeAnzaJig, unfortunately, I was working on sweater #2 at the same time and with two toddlers, I can only work at nap and nighttime. Not to mention keeping up with the house chores. I would say from the time I casted on to the finish, maybe 2-3 months. And that is because I never got the time to knit to my heart’s content. It was just whenever I had time. I finished sweater #2 (Tempted II) in late April so May and June was dedicated just to this sweater.

It’s just Beautiful!

WOW!!! That is fantastic!!! :heart: