80's pattern Sirdar 5705 Aran & Lace top

Question about instructions:

Row 1 of pattern reads “K2, (P2, K2tog, yfrd, yrn, yon.
According to the abbreviations, TFRD = yarn forward, YRN = yarn round needle, YON = yarn over needle. YouTube stated that these are three ways of saying the same thing? If so, why did they write the instruction like this? Do I: bring the yarn to the front, then wrap around the needle so the yarn is back at the front, then over the needle to the back again (making a double wrap around the needle with the yarn? A further instruction states P8, C5B, P8 - I am assuming that is Purl 8, Cable 5 Back, Purl 8? Any help would be appreciated. I have written to Sirdar Customer Service, but they have not responded.

https://www.cafr.ebay.ca/itm/375314894612
The different ways of defining yarn overs depend on the country of origin of the pattern. In the US patterns tend to say “Yarn over.” In other countries the patterns are more specific about how to work the yarn over in case it’s between knits and purls or just purls rather than between knit sts. It’s the designer’s or editor’s style preference.
The end result is that you want to create one new loop over the needle. Here’s a video that may help:

C5B should be defined in the pattern either at the beginning or the end of the pattern. It should be 5sts involved in the cable but different patterns define this cable different ways. It could be hold 2sts to the back, k3 then k2 from the held sts or another variation on this example. See if the pattern has a stitch glossary.

1 Like

This reads double yo for me but honestly I dunno.

Roxanne Richardson in the video salmonmac posted knows her cables front to back and inside out. She’d be my first stop for how to do cables once you have the definition of what is meant by C5B. That’s not to say don’t ask here. Ask about anything you need help with.

2 Likes

I agree. Sounds like a double yarn over.

1 Like

I think the attempt to be clear is obfuscating for many Americans and others who prefer a yo instruction. I had to read here and do a lot of videos before I just started subbing yo where that’s what’s needed. I think knitting Continental makes it more confusing for me because I let the needles do the work and grab or pick the yarn. Lately with Norwegian purling I don’t often bring the yarn forward at all. If the knitting police :wink: saw me knit they’d carry me off and never let me near needles and yarn again. I’m sure it looks that odd.

2 Likes

I agree, sounds like 2 loops on the needle, some might call it a double yarn over. Check what to do with these loops on the wrong side, they may be worked as individual stitches or you may be told to work one and drop the other (in effect making the double loop into a single large loop) or some other specific instruction.

There really should be a key for the abbreviations to tell you what to do with C5B, check over the entire pattern for the description.

Personally I understand '“yarn forward” as just positioning the yarn to the front and nothing else. And a yarn over is wrapping the yarn around the needle (or the needle around the yarn) clockwise (I’ve seen “yarn under” in crochet that seems to be counterclockwise). The thing about yarn overs to create extra stitches in knitting is that depending on what the situation looks like, a yarn over can look either like a bit more than one turn or like barely half of one, so I’m guessing it’s specifying to position the yarn in front, then to place it over the needle, to signify a yarn over in situations where the yarn over will look like only half of a loop before more is knitted… :thinking:

1 Like

Thank you to everyone who responded to this question. The instructions “yfrd,yrn, yon” do actually mean a double yarn-over.

2 Likes